Company News

Steel tube standard comparison

Views : 6483
Update time : 2020-05-22 13:21:21

Steel tube standard comparison

Standard name and specification

Alternative Standard

DIN

ASME

Chinese

GB / T5310 for high pressure boiler

20G

st45.8

SA-210C

25MnG

 

SA-210C

Seamless for fluid transportation GB / T8163

     

Seamless GB / T3087 for medium and low pressure boilers

     

Standard name and specification

Alternative Standard

GB5310

ASME

Germany

Heat-resistant steel to seamless DIN17175

st35.8

20G

SA106B

st45.8

25MnG

SA-210C

Pressure load with seamless DINEN10216

P265GH (1.0425)

25MnG

 

P235GH(1.0345

25MnG

 

Welded seamless steel pipe DINEN10220

P235GH(1.0345)

25MnG

 

Standard name and specification

Alternative Standard

GB5310

DIN

US

ASTM / ASME 192 carbon seamless steel pipe for high pressure

     

Seamless carbon ASTM / ASME106B for high temperature operation

 

25MnG

15Mo3

Medium carbon seamless ASTM / ASME 210C for boilers and superheaters

 

25MnG

 

Black skin and surface hot-dip galvanized welding and seamless ASTM / ASME A53

     

 

cooling stave ,cast iron stave cooler ,blast furnace stave cooler ,blast furnace cooling stave ,cast iron cooling stave, Cast Iron Stave ,Cooler,Water-Cooling Converter Mouth,Cast Iron Tuyere Cooler,Cast Copper Tuyere Cooler,Chequer Supports,Cast Iron Water Jaker

Related News
Read More >>
Reliable Delivery for Formosa Vietnam | Transparent Production, Real Results Reliable Delivery for Formosa Vietnam | Transparent Production, Real Results
Jun .27.2025
We're proud to have completed a major delivery—spanning a set of blast furnace cast iron cooling stave over a focused three-month period—for Formosa Group (Vietnam), part of one of Asia's largest industrial conglomerates.
From Challenge to Collaboration: A Real Case of International Foundry Partnership From Challenge to Collaboration: A Real Case of International Foundry Partnership
Jun .25.2025
At METEC 2023, we reconnected with a long-time engineering partner in the blast furnace field.
In metallurgical cooling equipment, there’s no single answer — only the right process for each part. In metallurgical cooling equipment, there’s no single answer — only the right process for each part.
Jun .11.2025
When producing key components such as cooling staves, chequer supports, and Wear plate , we follow one principle: Let the casting process serve the design — not the other way around.
How We Deliver Reliability — One Package at a Time How We Deliver Reliability — One Package at a Time
Jun .11.2025
At Tianyu, we believe that precision equipment deserves precision packaging — starting before a single crate is built.